Topic location: Work log » Teaching » Schemes of Work
MrKiff Aug 27 '12

Art KS3 SOW - Thames Architecture - Installation and Modroc.

Please find the scheme of work attached to this post.


  MrKiff Aug 27 '12
Attachments:
  ThamesArchitectureProject (1).doc (52.5Kb)
MrKiff Aug 27 '12
Attached are some resources for this scheme of work.
Attachments:
  thamesarchitecturaltriptrail.pdf (5278.93Kb)
  picturestoextend.pdf (1518.32Kb)
  perspective.ppt (1604.5Kb)
  onepointperspective2.doc (107Kb)
  extensions.doc (302.5Kb)
MrKiff Aug 27 '12
Further resources for this scheme of work.